Hampton Wind Farm
Sinclair Knight Merz provided project management and engineering services for the design, development and construction of a 2 x 660 kW wind farm at Hampton, near Lithgow in western New South Wales. The farm was a pilot project and, being a relatively small renewable energy development, was sensitive to development and capital costs. As such, we very aware of the need to provide cost effective engineering and project management services while ensuring the project’s successful completion. Read More... |
|

|
Plant Life Assessment Huntly Power Station
Sinclair Knight Merz was engaged to carry out a plant life assessment of Huntly Power Station assets. The principal objective of the study was to identify the major plant limitations and propose the remedial tasks and investment strategies required to extend operation of the plant for a minimum of 20 years beyond its nominal design life of 30 years. A further requirement was the identification of quantifiable and economically beneficial performance improvement opportunities. Read More... |
|

|
Ord Hydro Scheme
The Ord River Dam Hydro Scheme is a privately funded, owned and operated power system in the East Kimberley region of Western Australia. It consists of a new 36 MW hydro electric power station at Lake Argyle interconnected, by lengthy 132 kV transmission lines, with existing diesel fuelled power systems at the Argyle Diamond Mine and the Kununurra township.
Sinclair Knight Merz played a key role in the development of the scheme from its initial feasibility studies through to final commissioning. Read More... |
|

|
Sinclair Knight Merz was engaged to carry out the design of Mactan Power Station, on Mactan Island, Cebu. The power station consists of four 12.5 MW MAN B+W medium speed diesel engines running on residual fuel oil No 6. Read More... |
|

|
Sinclair Knight Merz undertook a feasibility study into 300 MW of additional peak generation capacity at Loy Yang B power station. The study was followed by detailed front end work required for the specification. Read More... |
 |
Cogeneration at Unichema Industrial Plant
Sinclair Knight Merz was engaged by the turnkey contractor, Detroit Engine & Turbine Company (DETCO), to provide engineering, procurement and contract management services for a 2 x 5MW cogeneration facility at Unichema, Port of Melbourne. The facility includes two 5MW steam injected gas turbines with two 32t/h supplementary fired waste heat steam generators. Two gas fired high pressure packaged boilers, each rated at 10t/h and 70bar were also provided with optional waste fuel oil (tallow) firing capability. The plant also consumes 10,000m3/h of odorous factory off-gas in the HP boilers. Read More... |
|
|
|
|
 |
North West Power Project Mount Isa
Sinclair Knight Merz carried out detailed technical and economic reviews to establish economic power generation options to provide power to new mines being developed or planned in the Carpentaria Minerals Province of western Queensland and Mount Isa. Read More... |
|
|
|
|
|
|
|